The Puducherry Electricity Department is planning to generate 30 MW of solar power from rooftop installations over the next two years as part of the “green energy-solar city” initiative. The UT has received capacity allocation of 5 MW and 25 MW, respectively, for FY 19-20 and FY 20-21. Accordingly, Puducherry Electricity Department has empaneled vendors for 30 MW capacity. Applications and installations to be initiated shortly.

Rooftop Solar Target Defined by Govt of India: 100 MW by 2022

Grid Connected Rooftop Solar in Puducherry

MNRE Capacity Allocation for CFA Projects

FY 19-20: 5 MW
FY 20-21: 25 MW

Implementing Agency
Puducherry Electricity Department

Cumulative Installed Capacity
(as on May 2021)

13.1 MW

Prices Discovered for tenders issued

Tender Issued for Empanelment of vendors to implement 30MW RTS

  1. Eligible Consumers: Residential Consumer
  2. Metering Arrangement & Business Model: Net metering with consumer investment
  3. Price Discovered:
    Capacity (kWp) Rate discovered
    1 – 3 kW 35,900
    3 – 10 34,900
    10 – 100 36,400
    100 – 500 34,350

Submit Application for Rooftop Solar

Apply Now

Regulatory Framework
Metering Arrangement Net Metering
Capacity Limit
  • 1kWp to 500kWp
  • For Group & Virtual net metering– 5kWp to 500kWp
  • Upto 100% of connected load/contract demand
  • DT Loading limit upto 75%
Surplus energy settlement APPC or FiT

DISCOM Point of Contact

Name: Mr. T Chanemougam

Designation: Nodal Officer

Email: se1ped.pon@nic.in

Contact number: 9489080301