95% of power generation in the Andaman and Nicobar Islands comes from diesel, with the remaining 5% from hydroelectricity. Fuel accounts for 80% of the cost of diesel-based power generation. There are 41 Diesel Power Houses at different locations in these islands having DG capacity ranging from 6 KW to 5000 KW (including 20 MW IPP) and one Hydro Power Station having 5.25 MW capacity at Kalpong.

A&N ED has completed vendor empanelment for 5 MW of solar rooftop capacity (1 MW residential, 2 MW commercial and government, 2 MW industrial). The overall installed capacity is currently 4.15 MW. The Government of India aims to reduce reliance on diesel and achieve 20 MW of installed solar rooftop capacity by the end of next year.*

* Source: “Website of Electricity department, Andaman and Nicobar Administration”

Rooftop Solar Target Defined by Govt of India: 20 MW by 2022

Grid Connected Rooftop Solar in Andaman and Nicobar

MNRE Capacity Allocation for CFA Projects

FY 21-22: 1 MW

Implementing Agency
Andaman and Nicobar Islands Electricity Department

Cumulative Installed Capacity
(as on May 2021)

4.15 MW

Prices Discovered for tenders issued

Tender Issued for Empanelment of vendors to implement 1MW RTS

  1. Eligible Consumers: Residential
  2. Metering Arrangement & Business Model: Net metering with consumer investment
  3. Price Discovered:
    Capacity Slabs Price Discovered (Rs/kWp)
    1 to 3kWp 86,405
    4 to 10kWp 70,070
    11-50kWp 59,180
  4. List of Empanelled Vendors:

Submit Application for Rooftop Solar

Apply Now

Regulatory Framework
Metering Arrangement Net Metering
Capacity Limit
  • 1kWp to 500kWp
  • For Group & Virtual net metering– 5kWp to 500kWp
  • Upto 100% of connected load/contract demand
  • DT Loading limit upto 75%
Surplus energy settlement APPC or FiT

DISCOM Point of Contact

Name: Ms. Deepa Nair

Designation: Nodal Officer

Email: eenrse@gmail.com

Contact number: 9679552900